冷再生技術(shù)在道路施工中具有諸多優(yōu)勢(shì),但在高溫天氣下施工需要特別注意一些事項(xiàng)。以下是冷再生機(jī)在高溫天氣下的施工注意事項(xiàng):
Cold recycling technology has many advantages in road construction, but special attention should be paid to some matters during construction in high temperature weather. The following are construction precautions for cold recycling machines in high temperature weather:
一、材料選擇與準(zhǔn)備
1、 Material selection and preparation
瀝青材料:在高溫天氣下,瀝青的性能會(huì)受到較大影響。應(yīng)選擇適合高溫環(huán)境的瀝青種類(lèi),確保其在高溫下仍能保持良好的粘結(jié)性和穩(wěn)定性。例如,可以選擇軟化點(diǎn)較高的瀝青,以減少在高溫下的軟化流動(dòng)。同時(shí),要注意瀝青的存儲(chǔ)和運(yùn)輸條件,避免長(zhǎng)時(shí)間暴露在高溫環(huán)境中,以免影響其性能。
Asphalt material: In high temperature weather, the performance of asphalt will be greatly affected. Asphalt types suitable for high temperature environments should be selected to ensure good adhesion and stability even at high temperatures. For example, asphalt with a higher softening point can be chosen to reduce softening flow at high temperatures. At the same time, attention should be paid to the storage and transportation conditions of asphalt, avoiding prolonged exposure to high temperature environments to avoid affecting its performance.
再生材料:對(duì)于冷再生所使用的舊路面材料,應(yīng)進(jìn)行充分的檢測(cè)和評(píng)估。在高溫天氣下,舊路面材料可能會(huì)更加干燥,容易出現(xiàn)松散等問(wèn)題。因此,在施工前應(yīng)對(duì)舊路面進(jìn)行適當(dāng)?shù)念A(yù)處理,如灑水濕潤(rùn)等,以提高再生材料的質(zhì)量。
Recycled materials: For the old pavement materials used in cold recycling, sufficient testing and evaluation should be conducted. In hot weather, old pavement materials may become drier and more prone to looseness and other issues. Therefore, appropriate pre-treatment should be carried out on the old road surface before construction, such as watering and moistening, to improve the quality of recycled materials.
二、設(shè)備調(diào)試與維護(hù)
2、 Equipment debugging and maintenance
冷再生機(jī)調(diào)試:在高溫天氣下,冷再生機(jī)的工作性能可能會(huì)受到影響。因此,在施工前應(yīng)仔細(xì)調(diào)試?yán)湓偕鷻C(jī),確保其各項(xiàng)參數(shù)設(shè)置合理。特別是對(duì)于銑刨深度、再生劑添加量等關(guān)鍵參數(shù),應(yīng)根據(jù)高溫環(huán)境進(jìn)行適當(dāng)調(diào)整。
Cold regeneration machine debugging: In high temperature weather, the working performance of the cold regeneration machine may be affected. Therefore, the cold recycling machine should be carefully debugged before construction to ensure that its various parameter settings are reasonable. Especially for key parameters such as milling depth and the amount of regenerant added, they should be adjusted appropriately according to the high temperature environment.
設(shè)備維護(hù):高溫天氣下,設(shè)備的故障率可能會(huì)增加。因此,應(yīng)加強(qiáng)對(duì)冷再生機(jī)及其他施工設(shè)備的維護(hù)保養(yǎng)。定期檢查設(shè)備的冷卻系統(tǒng)、液壓系統(tǒng)等關(guān)鍵部位,確保其正常運(yùn)行。同時(shí),要準(zhǔn)備好備用設(shè)備和零部件,以便在設(shè)備出現(xiàn)故障時(shí)能夠及時(shí)更換。
Equipment maintenance: Under high temperature weather, the failure rate of equipment may increase. Therefore, maintenance and upkeep of cold recycling machines and other construction equipment should be strengthened. Regularly inspect key components such as the cooling system and hydraulic system of the equipment to ensure their normal operation. At the same time, spare equipment and components should be prepared so that they can be replaced in a timely manner in case of equipment failure.
三、施工過(guò)程控制
3、 Construction process control
溫度控制:高溫天氣下,施工過(guò)程中的溫度控制尤為重要。應(yīng)密切關(guān)注施工現(xiàn)場(chǎng)的溫度變化,采取適當(dāng)?shù)拇胧┙档褪┕囟?。例如,可以在施工現(xiàn)場(chǎng)設(shè)置遮陽(yáng)設(shè)施,避免陽(yáng)光直射;在再生材料中添加適量的水,以降低材料的溫度。
Temperature control: Temperature control during construction is particularly important in high temperature weather. We should closely monitor the temperature changes at the construction site and take appropriate measures to reduce the construction temperature. For example, shading facilities can be installed at the construction site to avoid direct sunlight; Add an appropriate amount of water to the recycled material to lower its temperature.
壓實(shí)度控制:高溫天氣下,再生材料的壓實(shí)度可能會(huì)受到影響。因此,應(yīng)加強(qiáng)對(duì)壓實(shí)過(guò)程的控制,確保再生材料能夠達(dá)到設(shè)計(jì)要求的壓實(shí)度??梢赃m當(dāng)增加壓實(shí)遍數(shù),提高壓實(shí)機(jī)械的壓力等。
Compaction control: Under high temperature weather, the compaction degree of recycled materials may be affected. Therefore, it is necessary to strengthen the control of the compaction process to ensure that the recycled materials can achieve the required compaction degree in the design. It is possible to increase the number of compaction passes appropriately and increase the pressure of the compaction machinery.
施工進(jìn)度控制:高溫天氣下,施工人員的工作效率可能會(huì)降低。因此,應(yīng)合理安排施工進(jìn)度,避免在高溫時(shí)段進(jìn)行高強(qiáng)度的施工。可以采取早晚施工、中午休息等方式,確保施工人員的身體健康和施工安全。
Construction progress control: Under high temperature weather, the work efficiency of construction personnel may decrease. Therefore, the construction schedule should be arranged reasonably to avoid high-intensity construction during high temperature periods. We can adopt methods such as morning and evening construction, lunch break, etc. to ensure the physical health and construction safety of construction personnel.
四、質(zhì)量檢測(cè)與驗(yàn)收
4、 Quality inspection and acceptance
施工過(guò)程檢測(cè):在施工過(guò)程中,應(yīng)加強(qiáng)對(duì)冷再生路面的質(zhì)量檢測(cè)。定期檢測(cè)再生材料的含水量、壓實(shí)度、平整度等指標(biāo),及時(shí)發(fā)現(xiàn)問(wèn)題并進(jìn)行調(diào)整。同時(shí),要注意檢測(cè)施工過(guò)程中的溫度變化,確保施工溫度在合理范圍內(nèi)。
Construction process inspection: During the construction process, it is necessary to strengthen the quality inspection of cold recycled pavement. Regularly check the moisture content, compaction degree, flatness and other indicators of recycled materials, promptly identify problems and make adjustments. At the same time, attention should be paid to detecting temperature changes during the construction process to ensure that the construction temperature is within a reasonable range.
竣工驗(yàn)收:在施工完成后,應(yīng)按照相關(guān)標(biāo)準(zhǔn)進(jìn)行竣工驗(yàn)收。對(duì)冷再生路面的各項(xiàng)性能指標(biāo)進(jìn)行全面檢測(cè),確保其符合設(shè)計(jì)要求和使用標(biāo)準(zhǔn)。如果發(fā)現(xiàn)質(zhì)量問(wèn)題,應(yīng)及時(shí)進(jìn)行整改,確保路面的質(zhì)量和使用壽命。
Completion acceptance: After the construction is completed, the completion acceptance should be carried out in accordance with relevant standards. Conduct comprehensive testing on various performance indicators of cold recycled pavement to ensure that it meets design requirements and usage standards. If quality problems are found, they should be rectified in a timely manner to ensure the quality and service life of the road surface.
總之,冷再生機(jī)在高溫天氣下施工需要注意材料選擇與準(zhǔn)備、設(shè)備調(diào)試與維護(hù)、施工過(guò)程控制和質(zhì)量檢測(cè)與驗(yàn)收等多個(gè)方面。只有做好這些工作,才能確保冷再生路面的質(zhì)量和使用壽命,為道路建設(shè)做出更大的貢獻(xiàn)。
In short, the construction of cold recycling machines in high-temperature weather requires attention to multiple aspects such as material selection and preparation, equipment debugging and maintenance, construction process control, and quality inspection and acceptance. Only by doing these tasks well can we ensure the quality and service life of cold recycled road surfaces, and make greater contributions to road construction.